OSHA Strategic Partnership Program<< Back to List of Partnership Closures


Associated Builders and Contractors (ABC) - Mississippi Chapter
#116
   
Date Signed: September 12, 2000 (renewed November 1, 2003)
Date Concluded: November 30, 2006
Contact Information: Jackson Area Office, (601) 965-4606
or Regional Partnership Coordinator
 
Overview:
Associated Builders and Contractors, Inc., (ABC) and the Occupational Safety and Health Administration (OSHA) have entered into this Partnership to provide a safe and healthful work environment in the construction industry. Implementation of this agreement is expected to result in decreased injuries, illnesses, and fatalities for participant contractors with a resultant decrease in workers' compensation costs. ABC member construction companies will use the Safety Training and Evaluation Process, or "STEP" program, in evaluating their safety and health management system performance and their safety and health training programs. The primary goals are to: reduce by three percent annually the number of injuries, illnesses, and fatalities affecting participant employers, with an emphasis on reducing injuries and fatalities resulting from falls, struck-by and caught-in mishaps, and electrocution (focused four construction hazards); increase the number of construction companies that implement effective safety programs; decrease workers' compensation costs and OSHA penalties for contractor participants; and, allow OSHA to focus resources on companies that require attention from OSHA, rather than companies that have demonstrated existence of effective safety programs.

Results:
At the end of 2005, the three-year total case rate was 2.7, a reduction from 2004's 3.4. This is more than 50% below the BLS rate of 6.3. Also, the three-year days away rate was 1.5, approximately 50% below the baseline rate of 3.4.

The average employer insurance modification rate for members in the Partnership in 1999 was 0.72. The average rate for the partners in 2000 was reduced to 0.70. The partners have maintained this average for 2001 and 2002. In 2004, this was reduced to .69 and has remained the same for 2005.

 

Chatham County Nursing Homes Partnership
#48
   
Partners: Azalealand Nursing Home; Riverview Health and Rehabilitation Center;
Tara at Thunderbolt; Westview Nursing and Rehab; Moss Oaks Health Care
Date Signed: May 10, 2001 (renewed May 1, 2003)
Date Concluded: June 1, 2004
Contact Information: Savannah Area Office, (912) 652-4393
or Regional Partnership Coordinator
 
Overview:
Partnering Chatham County, Georgia nursing homes have established a goal of 10% reduction in illnesses and injuries. Nursing home administrators agreed to maintain an effective and comprehensive safety and health management system at their facilities and to train employees in hazard recognition specific to their industry.

Results:
The days away rate for the Partnership's 8 participating nursing homes was reduced from 7.6 in 2001 to 5.6 in 2002, a 27% reduction. This Partnership showed a positive impact in 2002, with 6 nursing homes experiencing a reduction in work-related injury and illness rates. OSHA Compliance Assistance Specialists have organized and held several outreach sessions with the Nursing Home Association of Georgia in which partnering and non-partnering nursing homes attended.



Molten Metals Industries Partnership
#213
   
Partners: U.S. Pipe and Foundry Company, Inc.; Citation Southern Ductile; U.S. Castings; The Union Foundry Co.; Talladega Casting and Machine Co., Inc.; Nailfast, Inc. DBA/Clark Wire; Jacobs Manufacturing Co.; Southern Tool, Inc.; Barry Pattern and Foundry Co., Inc.; Corus Tuscaloosa; ITT Procast Foundry; Citation Foam Casting Co.; W.J. Bullock, Inc.; Alabama Die Casting, Inc.; Southern Aluminum Casting Co.; Globe Mettallurgical, Inc.; Thermalex, Inc.; Tommie Corp.; Carmack, Inc.; Dura-Cast, Inc.; Southern Aluminum Casting Co.; IPSCO Steel, Inc.; Marion Citation; Brewton Iron Works, Inc.; U.S. Pipe and Foundry Co., Inc.; Birmingham Steel Corporation; Comm Scope; Shelco Foundries, Inc.; Alabama Casting Co.; National Metals, Inc.; Glidwell Specialties Foundry Co., Inc.; Imperial Casting Co., Inc.; Glass, Molders, Pottery, Plastics Workers Union; United Steel Workers of America AFL-CIO-CLC; International Brotherhood of Electrical Workers; International Association of Machinists; Boilermakers Local; University of Alabama; Safe State Consultation Program
Date Signed: September 30, 2002
Date Concluded: September 30, 2005
Contact Information: Birmingham Area Office, (205) 731-1534
Mobile Area Office, (334) 441-6131
or Regional Partnership Coordinator
 
Overview:
This Partnership is focusing on safety and health hazards in the molten metal industry. Special emphasis is placed on reducing occupational exposure to silica, lead, and noise.

Results:
OSHA, along with Alabama Safe State Consultation, has conducted outreach sessions for employers and their labor groups. Four training sessions were held for the partners, including: guidelines for compliance with the lead standard and noise standard and recommendations for the controlling silica exposure; foundry ventilation and noise monitoring; respiratory protection; and, machine guarding. A web page was developed by Alabama Safe State Consultation so Partnership members can input data and obtain information.

This Partnership encompasses 35 employers and 4,853 employees, as well as 14 industry associations and 10 organized labor groups.

 

Associated General Contractors (AGC)/ Construction Safety and Health Excellence (CHASE) - Georgia
#251
   
Date Signed: November 20, 2002
Date Concluded: November 20, 2005
Contact Information: Atlanta East Area Office, (770) 493-6644
Atlanta West Area Office, (770) 984-8700
Savannah Area Office, (912) 652-4393
or Regional Partnership Coordinator
 
Overview:
The Associated General Contractors of America and OSHA partnered to improve safety and health at construction sites. Goals include annual reductions of three percent in injuries and illnesses, implementation of effective safety and health management systems at partner sites, and training of managers, supervisors and employees.

Results:
This Partnership has encouraged AGC members to develop safety and health management systems, and the AGC Georgia Branch offers resources to assist member construction companies in developing these systems. The AGC Georgia Branch has provided Partnership participants safety and health training on trenching and excavations, fall protection, steel protection, OSHA 10-hour, OSHA 30-hour, CPR, first aid, bloodborne pathogens, and scaffold safety. The branch also has two vans traveling throughout the state visiting members' jobsites to conduct tool box talks in both English and Spanish.

At the completion of the partnership, the partnership experienced a total case incident rate of 3.04 with almost 2 million hours worked. This is approximately 50% below the BLS National Average for 2004.



Georgia Concrete and Products Association
#376
   
Partners: Georgia Institute of Technology - Safety, Health and Environmental Division (GA Tech) and the Georgia Concrete and Products Association (GC&PA)
Date Signed: October 13, 2004
Contact Information: Savannah Area Office, (912) 652-4393
or Regional Partnership Coordinator
 
Overview:
This partnership was implemented as a means to improve safety and health practices, to increase the level of formal safety training, to enhance workplace safety and health programs, and to reduce injuries and illnesses. Specific partnerships goals include the 30 percent reduction in the total case incident rate (TCIR) for participating members; increase in the number of sites implementing formal safety and health programs; increase in the number of employees completing safety and health training and increase the number of workplace safety activities for companies that participate in the partnership by collecting and sharing safety and health related best practices with all participants.

Results:
In 2005, the partnership experienced a Total Case Incident Rate of 6.3, which is below both the baseline rate and the BLS National Average, 7.0 and 7.2 respectively. With this partnership, Georgia Institute of Technology developed a Chipout training program designed to help workers when they chip out hardened concrete from the interior of mixer drums on concrete trucks.



Associated General Contractors (AGC)/Construction Safety and Health Excellence (CHASE) - South Florida
#209
   
Date Signed: September 19, 2002; Amended April 6, 2005
Date Concluded: September 19, 2005
Contact Information: Fort Lauderdale Area Office, (954) 424-0242
or Regional Partnership Coordinator
 
Overview:
The Associated General Contractors of America and OSHA partnered to improve safety and health at construction sites. Goals include annual reductions of three percent in injuries and illnesses, implementation of effective safety and health management systems at partner sites and training for managers, supervisors and employees.

Results:
Eight construction companies are currently participating in the Partnership. AGC has developed a program to assist member companies in developing better safety and health management systems. AGC has also provided safety and health training on falls, scaffolding, excavation and trenching and other safety related topics, including the OSHA-10 Hour Construction Safety and Health course. All of AGC's training classes are also offered in Spanish.

The AGC South Florida Chapter has held two safety and health fairs to promote the Partnership and allow workers to showcase new and innovative ideas on how to make their jobs safer. Additionally, this Partnership has strengthened the relationship between AGC members and the Fort Lauderdale OSHA Area Office. The Area Office has participated in several of the OSHA 10-hour Construction Safety and Health Courses given by AGC members in English and Spanish.



The Georgia Aquarium, Inc.
#344
   
Partners: Brasfield & Gorrie, LLC; Georgia Institute of Technology-Safety, Health and Environmental Technology Division
Date Signed: May 13, 2004
Date Concluded: November 1, 2005
Contact Information: Atlanta West Area Office, (770) 984-8700
or Regional Partnership Coordinator
 
Overview:
Georgia Institute of Technology, Safety Health and Environmental Division, and Brasfield and Gorrie, LLC and their subcontractors performing work at the Georgia Aquarium site are partnering with OSHA. The purpose of the Partnership is to increase the number of employers in the construction industry with effective safety and health management systems, reduce injuries and illnesses, eliminate fatalities, and increase the number of construction employees with OSHA 10 and 30-hour safety and health training.

 

Mammoth Cave National Park
#395
   
Partners: National Park Service, Mammoth Cave Electrical Renovation Project and the Chappy Corporation
Date Signed: December 15, 2004
Date Concluded: December 31, 2006
Contact Information: Frankfort Area Office, (502) 227-7024
or Regional Partnership Coordinator
 
Overview:
The purpose of this partnership is the reduction of occupational injuries and illnesses and elimination of all fatalities during Mammoth Cave Electrical Renovation Project. Specific goals include reduction in the total number of injury/illness cases by 10% per year for duration of the project, identification and prevention of causal factors contributing to injuries and fatalities, resulting from the four primary causes of construction injuries: falls, struck-by and caught-in incidents, and electrocution, training for supervisors and crew leaders and employee involvement in the safety and health management system with activities such as site inspections, job hazard analysis, and mishap investigations.

Results:
The total case incident rate for the site experienced a large drop between 2003 (5.6) and 2005 (1.9), which represents a 65% drop. Due to this partnership, the management at Chappy Corporation recognized the need to have full management involvement and participation in their safety and health program. As a result, all employees have received formal OSHA training covering fall protection, ladder safety, electrical safety, power tools, hand tools, walking-working surfaces, lifting safety, and Radon safety.

 

Jacksonville International Airport Partnership
#377
   
Partners: Centex Rooney/ACI Joint Venture Partners; University of South Florida (USF) Consultation Program
Date Signed: January 28, 2005
Concluded Signed: June 31, 2009
Contact Information: Jacksonville Area Office, (904) 232-2895
or Regional Partnership Coordinator
 
Partnership Overview:
This partnership focused on the elimination of hazardous conditions by establishing an effective and pro-active safety and health program. The primary objective of this agreement was the reduction of workplace injuries and illnesses and the elimination of fatalities. The goals employed to achieve these results included the development of a comprehensive safety and health program, increased hazard awareness and hazard recognition, as well as increased safety and health training.

Partnership Results:
The construction at the site has remained inactive for 2005. However, groundbreaking has commenced in April of 2006.



Associated General Contractors (AGC) - Florida East Coast Chapter
#406
   
Partners: Florida East Coast Chapter of AGC
Date Signed: February 1, 2005
Date Concluded: June 1, 2009
Contact Information: Fort Lauderdale Area Office, (954) 424-0242
or Regional Partnership Coordinator
 
Partnership Overview:
This partnership between the Florida East Coast Chapter of Associated General Contractors of America (AGC) and the Occupational Safety and Health Administration, Fort Lauderdale and Tampa Area Offices, was intended to serve as the Construction Safety and Health Excellence (CHASE) partnership between the two organizations. Partnership goals required 5% annual reduction in the number of injuries, illnesses, and fatalities affecting participant employers, with an emphasis on reducing injuries and fatalities resulting from those hazards that are the four leading causes of death on construction sites (falls, struck-by, caught in/between and electrocutions) and a increase in the number of general and specialty contractors who implement effective safety and health programs and provide effective safety and health training for management, supervisors and employees.

Partnership Results:
This partnership between the Florida East Coast Chapter of Associated General Contractors of America (AGC) and the Occupational Safety and Health Administration, Fort Lauderdale and Tampa Area Offices, was intended to serve as the Construction Safety and Health Excellence (CHASE) partnership between the two organizations. Partnership goals required 5% annual reduction in the number of injuries, illnesses, and fatalities affecting participant employers, with an emphasis on reducing injuries and fatalities resulting from those hazards that are the four leading causes of death on construction sites (falls, struck-by, caught in/between and electrocutions) and a increase in the number of general and specialty contractors who implement effective safety and health programs and provide effective safety and health training for management, supervisors and employees.



Alabama Automotive Manufacturing Group (AAMG)
#413
   
Partners: Alabama Automotive Manufacturing Group, Alabama Industrial Development Training Institute, and Safe State, Alabama Consultation Program and Participating Tier One Suppliers
Date Signed: April 1, 2005
Date Concluded: September 25, 2009
Contact Information: Mobile Area Office (251) 441-6131; Birmingham Area Office (205) 731-1534
or Regional Partnership Coordinator
 
Partnership Overview:
This partnership was designed to specifically target the prevailing worker exposures to hazards in the automotive industry, such as unguarded machinery, hazardous chemicals, as well as effective control and isolation of stored energy. Improvements in these target areas was accomplished through demonstrated leadership and the development and implementation of effective health and safety management systems at partner worksites.

The primary goal of this partnership was to establish a workplace where recognized industry hazards are minimized and controlled through the creation of a pro-active health and safety culture and a cooperative relationship that optimizes the resources of all members. Specific strategies towards achieving the primary goal, included development and implementation of effective hazard assessments and job safety analyses for all facilities, equipment, and processes and reduction in the Total Case Incident Rate for HMMA and its Tier-One suppliers participating in the agreement by 10% per year.

Partnership Results:
During the evaluation period of January 1, 2007 - December 31, 2007, 6,923 employees received 32,757 hours of training. 19 SHMS were enhanced and reductions in Total Case Injury Rate and Days Away from Work Restricted and Transferred Activity declined from 21.6 and 12.8 in 2006, to 8.7 and 5.0 in 2007 respectively. 24% and 23% respectively below the 2006 BLS average for automotive manufacturing industry.



Rome, Georgia, Water Pollution Control Plant (WPCP) Improvement Project
#414
Partners: OSHA Atlanta-West Area Office, the Georgia Institute of Technology, Safety and Health and Environmental Division (Georgia Tech) and Atlantic Skanska, Inc.
Date Signed: April 6, 2005
Date Concluded: September 5, 2007
Contact Information: OSHA Atlanta-West Area Office, (770) 984-8700
or Regional Partnership Coordinator
Overview:
OSHA, Georgia Tech and Atlantic Skanska have agreed to work cooperatively through this OSHA Strategic Partnership agreement, during the Rome WPCP - Improvements Project to increase the number of employers in the construction industry with effective safety and health management systems, reduce injuries and illnesses, eliminate fatalities, and increase the number of construction employees with OSHA 10 and 30-hour safety and health training. Specific partnership goals include reducing the total number of injury and illness cases by 10% per year for the duration of the partnership and identification and elimination of causal factors contributing to injuries and fatalities, especially those resulting from the four primary causes of construction injuries: falls, struck-by and caught-in incidents, and electrocution.

Results:
In 2006, 343 employees and 11 supervisors were trained through a variety of courses such as the OSHA 10 and 30 Hours Safety Classes, Certified Crane Operator Training, and Incident Prevention Program. In 2005, the TCIR and DART rates both were 2.57 and in 2006, the partnership achieved zero TCIR and DART rates.

 

Associated General Contractors, Construction Health and Safety Excellence II South Florida, Jacksonville
#418
   
Partners: OSHA-Jacksonville Area Office and Associated General Contractors of America, South Florida Chapter
Date Signed: July 6, 2005
Date Concluded: October 29, 2009
Contact Information: OSHA Jacksonville-Area Office, (904) 232-2895
or Regional Partnership Coordinator
 
Partnership Overview:
AGC South Florida Chapter and the OSHA Fort Lauderdale Area Office entered into a new agreement in response to OSHA new requirements regarding partnerships. This new agreement established a multi-step program to provide guidance for contractors to provide and develop excellent safety and health management systems for their employees. The primary goals of this agreement were: reduce by 5% annually the number of lost workdays, restricted workdays and transfers due to injuries, illnesses, affecting participant employers, with an emphasis on reducing injuries and fatalities resulting from falls, struck-by and caught-in mishaps, and electrocution (focused four construction hazards); increase the number of general and specialty contractors who implement effective safety and health management systems; provide safety and health training for managements, supervisors and employees; allow OSHA to focus resources on companies that require attention from OSHA, rather than companies that have demonstrated existence of effective safety programs.

Partnership Results:
During the evaluation period, July 6, 2005 - July 5, 2006, there were no active participants.



Centex Construction/Villas at Reunion Square
#475
   
Partners: Centex Construction, OSHA-Tampa Area Office, and University of South Florida (USF) Consultation Program
Date Signed: July 24, 2006
Date Concluded: July 22, 2007
Contact Information: OSHA Tampa Area Office (813) 626-1177
or Regional Partnership Coordinator
 
Overview:
This partnership expands Occupational Safety and Health Administration's (OSHA's) reach into the construction arena, by enabling OSHA and Centex Construction to work with each subcontractor involved in the Villas @ Reunion Square Project. This agreement encourages work practices that utilize the latest technologies, while promoting an incident free, safe environment.

This partnership will focus on the elimination of hazardous conditions by establishing an effective and pro-active safety and health program. The primary objective of this agreement is the reduction of workplace injuries and illnesses, as well as the elimination of fatalities. The goals employed to achieve these results include the development of a comprehensive safety and health management systems, increased hazard awareness and hazard recognition, as well as increased safety and health training.

 

CDI Construction
#527
   
Partners: CDI Construction and Georgia Tech Institute of Technology Onsite
Safety and Health Consultation Program
Date Signed: December 13, 2006
Contact Information: Atlanta East Area Office, (770) 493-6644
or Regional Partnership Coordinator
 
Overview:
This partnering agreement was developed jointly by Occupational Safety and Health Administration (OSHA), the Georgia Institute of Technology Onsite Safety and Health Consultation Program (Georgia Tech) and CDI Contractors, LLC (CDI). The common objective and goals of the agreement are to reduce injuries and illnesses, increasing safety and health training, sharing of best work practices, increasing the number employers with safety and health management systems, and compliance with applicable OSHA standards and regulations.

To facilitate the goal of reducing occupational related fatalities and serious injuries within the construction industry OSHA, Georgia Tech and CDI, will implement an agreement under the OSHA Strategic Partnership Program (OSPP). This agreement will address the prevention of the workplace injuries, illnesses and fatalities, as well as the development and implementation of effective safety and health management systems.

This agreement will cover the Village at Riverwatch Open Air Lifestyle Center Mall Project in Augusta, Georgia. The project will consist of 11 buildings, including 2 large retail anchor stores on 127 acres. A different general contractor, who is not participating in this agreement, will construct the Belks anchor store. Additionally, tenant-finish contractors will not fall under this partnership (unless otherwise specified). Building construction will start in October 2006 with the grand opening of Mall scheduled for March 2008.

By focusing its efforts and utilizing the skills, knowledge and resources of OSHA, CDI and Georgia Tech expect to reduce exposure to hazards and thereby decrease the possibility of serious injuries and fatalities at the Village at Riverwatch Construction Project.



Georgia State University Science Park Project
#588
   
Partners: McCarthy Building Companies and Georgia Tech Institute of Technology Onsite Safety and Health Consultation Program
Date Signed: November 16, 2007
Date Concluded: April 7, 2011
Contact Information: Atlanta-West Area Office, (770) 984-8700
or Regional Partnership Coordinator
 
Partnership Overview:
This agreement covered the Georgia State University Science Park Project in Atlanta, Georgia. The project consisted of one building containing nine floors covering 334,580 square feet, with a mechanical penthouse. The common objective and goals of the agreement were to reduce injuries and illnesses, increasing safety and health training, sharing of best work practices and increasing the number employers with safety and health management systems.

 

White-Spunner Construction Corporate Office Project
#610
   
Partners: White-Spunner Construction, Inc.; University of Alabama Safe State Onsite Safety and Health Consultation Program; and Associated General Contractors, Alabama Chapter
Date Signed: December 13, 2007
Date Concluded: June 30, 2008
Contact Information: Mobile Area Office (251) 441-6131
or Regional Partnership Coordinator
 
Overview:
The common objective and goals of this partnership are to reduce injuries and illnesses, increasing safety and health training, sharing of best work practices, increasing employers with safety and health management systems, and compliance with applicable OSHA standards and regulations. This agreement will address the prevention of the workplace injuries, illnesses and fatalities, as well as the development and implementation of effective safety and health management systems.

This agreement will cover the White-Spunner Construction Corporate Office Project in Mobile, Alabama. The project will consist of their corporate office that will be a 2 story 40,000sq ft office building. Building Construction will start in August 2007 with a finishing date scheduled for August 2008. White-Spunner Construction expects to reduce exposure to hazards, serious injuries and fatalities by focusing its efforts and the combined resources of OSHA, Safe State and the Alabama AGC.

Results:
At the conclusion of the partnership 15 subcontractors and approximately 250 employees was covered by this partnership. 13 of the 15 subcontractors implemented effective safety and health management systems. Over 300 hours of training was provided to the employees.

The total case incident rate (TCIR) and days away from work, restricted work activity, and job transfer ((DART) rate during the seven months of the construction at White-Spunner Corporate site was 1.8 and 0. respectively. This is more than 60% and 100% below the 2007 BLS National Average which is 4.5 and 2.1.

 

University of North Florida Student Housing Project
#639
   
Partners: Haskell Company, University of South Florida Consultation Program
Date Signed: April 9, 2008
Date Concluded: June 9, 2009
Contact Information: Jacksonville Area Office (904) 232-2895
or Regional Partnership Coordinator
 
Partnership Overview:
Pursuing efforts to eliminate serious hazards and achieve a high level of worker safety and health, OSHA; the Haskell Company, and University of South Florida Consultation Program developed a Partnership agreement. The goals of this Partnership included: encouraging local constructors and subcontractors involved in this project to improve their safety and health performance; implementing strategies to eliminate serious accidents, including construction industry-related hazards such as falls from elevation; electrical; struck-by; trenching and excavation; and providing employee safety and health training.

This partnership agreement covered the construction of the University of North Florida (UNF) Student Housing Project. The project involved construction of four residential towers, which will have 1,000 beds. The residential towers were constructed using full height tilt-up concrete panels, with hollow core and D-beams.

Founded over forty years ago, the Haskell Company ranks among the foremost design-build organizations in the United States, and serves clients throughout the Western Hemisphere. The Haskell Company provides complete planning; architectural; engineering; construction; program management; real estate; and financing and facility management services on a single-responsibility basis. The company's expertise spans industrial; commercial; institutional; public and civil infrastructure projects.



Springs at Effingham
#646
   
Partners: McShane Construction Corporation; Georgia Institute of Technology - Safety, Health and Environmental Division
Date Signed: June 12, 2008
Date Concluded: April 1, 2009
Contact Information: Savannah Area Office (912) 652-4393
or Regional Partnership Coordinator
 
Overview:
This partnership agreement was developed jointly by Mc Shane Construction Corporation; the Savannah Area Office of the Occupational Safety and Health Administration (OSHA) and Georgia Institute of Technology - Safety, Health and Environmental Division. The common objectives and goals of the agreement are to provide a safe and healthful work environment for employees engaged in construction activities on the Springs at Effingham Construction Project.

Goals of the partnership include: The overall goal of the partnership is to create a working relationship that will focus efforts on preventing work related fatalities, controlling or eliminating serious workplace hazards and injuries. In addition, the partnership will pursue efforts to reduce the number of work-related injury and illness cases by 10% quarterly for the duration of the project, using the first quarter of the project as the site's baseline. The partnership will focus in particular in construction industry hazards such as falls; electrocution; struck-by; caught in/caught between; silica; cranes; noise and trenching and excavation.

This partnership will involve the construction of a new 22 building, 2-story apartment complex which will be approximately 9,600 square feet per floor with 16 apartment units, per building. There will also be a clubhouse built, which will be a single story and approximately 4,400 square feet with a pool.

Results:
During the evaluation period of July 12, 2008 - April 1, 2009, this partnership impacted 41 subcontractors and 200 employees. Eight training sessions were conducted by Mc Shane Construction Corporation and OSHA with a total of 200 employees and 12 supervisors attending these training. Training sessions included; fall protection, scaffolding, Trenching, confined space entry, fall arrest systems, proper use of ladders, Proper use of protective equipment, Electrical safety and Erection of scaffolds. Also during the evaluation period 300 self inspections were performed and 450 hazards were identified and abated. The site Total Case Injury Rate declined from 2.1 to 2.0, but the Days Away from Work Restricted and Transferred Activity increased from 0 to 0.5. 61 percent and 81 percent respectively below the 2006 BLS average for the nonresidential building construction industry.

 

Savannah State University Construction Project
#656
   
Partners: Holder Construction Company and Georgia Institute of
Technology
Date Signed: August 12, 2008
Date Concluded: April 1, 2009
Contact Information: Savannah Area Office (912) 652-4393
or Regional Partnership Coordinator
 
Overview:
This partnership agreement between Holder Construction Company and the Georgia Institute of Technology is expected to stay active until March of 2009. This partnership will involve the construction of a new Academic Building by Holder Construction Company on the campus of Savannah State University, in Savannah, Georgia. The common objectives and goals of the agreement are to provide a safe and healthful work environment for employees engaged in construction activities at the Savannah State University Construction Project and is expect to reduce the number of work-related injury and illness cases by 10% quarterly for the duration of the project.

Results:
During the evaluation period of August 12, 2008 - April 1, 2009, this partnership impacted 27 subcontractors and 375 employees. Twelve training sessions were conducted by Holder Construction, Sub contractors and OSHA with a total of 200 employees and 12 supervisors attending these training. Training sessions included; fall protection, scaffolding, Trenching, confined space entry, fall arrest systems, proper use of ladders, Proper use of protective equipment, Electrical safety and Erection of scaffolds. Also during the evaluation period 300 self inspections were performed and 450 hazards were identified and abated. Holder Construction and the site's sub-contractors maintained an incident free workforce for the duration of this project. The 2007 BLS incident rate is 4.7 and 2.3 respectively for the construction of building industry. 

 

Gwinnett Braves Stadium Construction Project
#703
   
Partners: Barton Marlow Construction and Georgia Institute of
Technology On-Site Consultation Division
Date Signed: December 12, 2008
Date Concluded: April 1, 2009
Contact Information: Atlanta East Area Office, (770-493-7725)
or Regional Partnership Coordinator
 
Overview:
Georgia Institute of Technology and Barton Marlow and their subcontractors performing work at the Gwinnett Braves Stadium are partnering with OSHA to reduce injuries and illnesses, as well as eliminate fatalities. The short-term project, which is the construction of a ballpark for the Atlanta Braves' triple-A farm club, is scheduled for completion in spring of 2009. The site location is approximately 62 acres. The partnership will focus on increasing the number of employers in the construction industry that have effective safety and health management systems and incident-prevention programs. Emphasis will be on construction industry safety and health principles and practices, as well as communication of safety and health information to employees of contractors working on the site.

Results:
The project was concluded in early April of 2009; due to the drop-dead dead-line of April 17, 2009 date of the season opening game. During the four months of construction at Barton Marlow site 1,523 employees went trough the mandatory jobsite orientation that were conducted twice a week for thirty six weeks. Topic covered during the orientations included; Jobsite rules and regulations, safety requirements, accident response plan, employer responsibilities, employee's responsibilities and disciplinary action.

The total case incident rate (TCIR) and days away from work, restricted work activity, and job transfer ((DART) rate during the four months of the construction at the Gwinnett Braves Stadium site was 2.3 and .76 respectively. This is more than 57% and 70% below the 2006 BLS National Average, which is 5.4 and 2.7 and the baseline that the partnership used.



Georgia Aquarium Expansion
#732
   
Partners: Brasfield & Gorrie, LLC; Georgia Technical Research Institutes Occupational Safety and Health Program Office
Date Signed: August 11, 2009
Date Concluded: September 30, 2010
Contact Information: Atlanta West Area Office (770) 984-8700
or Regional Partnership Coordinator
 
Partnership Overview:
In May of 2004, OSHA signed a partnership for safety with Brasfield & Gorrie and the Georgia Tech Consultative Service for the Georgia Aquarium project. The 440,000 square foot aquarium is located on the Coco Cola complex in downtown Atlanta. The aquarium will feature more than five million gallons of marine and fresh water and more than 100, 000 animals representing 500 different species. As an ongoing effort to improve the health and safety of workers through cooperative partnerships, OSHA again signed a Strategic Partnership with Brasfield & Gorrie and the Georgia Technical Research Institute for the Georgia Aquarium Dolphin Expansion Project on August 11, 2009. The project aims to improve the overall special events and guest experiences through expansion of the facility with the addition of a 6th gallery which will consist of the newly constructed Dolphin tank.

The objectives and goals of this OSHA Strategic Partnership (OSP) were to reduce injuries and illnesses, increase safety and health training; share best work practices and increase the number of employers with safety and health management systems.



Westin Peachtree Plaza Window Replacement Project
#748
   
Partners: Skanska USA Building, Inc, Georgia Technology On-site
Consultation
Date Signed: February 23, 2010
Date Concluded: November 15, 2010
Contact Information: Atlanta West Area Office (770) 984-8700
or Regional Partnership Coordinator
 
Partnership Overview:
The Westin Peachtree Plaza Hotel is a skyscraper and hotel in downtown Atlanta, Georgia, on Peachtree Street. The facility is 723 feet tall, and 188 feet in diameter and reaches 73 stories above ground level. The Westin is the second tallest hotel in the Western Hemisphere. In March of 2008, the Westin sustained moderate damage with over 500 windows broken when a tornado tore through downtown Atlanta. The Westin Peachtree Plaza Window Replacement Project consisted of replacing all 6,350 windows in the hotel. Skanska Building USA led the replacement and worked with other subcontractors to complete the project.

OSHA and Georgia Tech’s On-site Consultation Service formed a partnership with Skanska Building USA in Atlanta to ensure the highest level of safety and health during the replacement project.

The partnership focused on increasing the number of construction companies with effective safety and health management systems and incident-prevention programs. The partnership worked to provide workers with effective safety and health training. The partnership agreement requires participating employers to train non-English speaking employees in workplace safety and health.