Department of Labor Seal photos representing the workforce - digital imagery? copyright 2001 photodisc, inc.
Department of Labor Seal www.osha.gov    [skip navigational links] Search    Advanced Search | A-Z Index
<<< Back to Armour Swift-Eckrich PSM Presentation


Link to Printing InstructionsPrinting Instructions | Text Version
 
HOME
Slides 1-10
Slides 11-20
Slides 21-30 Slide 31
Slide 32
Slide 33
Slide 34
Slide 35
Slide 36
Slide 37
Slide 38
Slide 39
Slide 40
Slides 41-46
Slide 35

    TEXT VERSION OF SLIDE:

    Title: Pre-Startup Safety Reviews
    Type: Text Slide
    Content:
    • The pre-Startup Safety Review for the new ammonia system failed to confirm that:
      • construction and equipment of process was in accordance with design specifications
      • P& ID's were complete and verified as accurate
      • Acceptance tests were performed on computer hardware and software, protection devices including alarms, interlocks, cutouts and level controls
      • Safety, operating, maintenance, and emergency procedures were complete
      • PHA had been performed
      • Employee training had been performed and understood

Back to Top Back to Top www.osha.gov www.dol.gov

Contact Us | Freedom of Information Act | Customer Survey
Privacy and Security Statement | Disclaimers
Occupational Safety & Health Administration
200 Constitution Avenue, NW
Washington, DC 20210