Unified Agenda - Table of Contents Unified Agenda - Table of Contents


1836. HEARING CONSERVATION PROGRAM FOR CONSTRUCTION WORKERS

Priority: Economically Significant. Major status under 5 USC 801 is undetermined.

Unfunded Mandates: Undetermined

Legal Authority: 29 USC 655(b); 40 USC 333

CFR Citation: 29 CFR 1926.52

Legal Deadline: None

Abstract: OSHA issued a section 6(b)(5) health standard mandating a comprehensive hearing conservation program for noise-exposed workers in general industry in 1983. However, no rule was promulgated to cover workers in the construction industry. A number of recent studies have shown that many construction workers experience work-related hearing loss. In addition, the use of engineering, administrative and personal protective equipment to reduce exposures to noise is not extensive in this industry. OSHA published an advance notice of proposed rulemaking to gather information on the extent of noise-induced hearing loss among workers in different trades in this industry, current practices to reduce this loss, and additional approaches and protections that could be used to prevent such loss in the future. The Agency is reviewing the comments received and other information to determine the appropriate course of action, but expects that an NPRM could be published in September 2004.


Timetable:

Action Date  

ANPRM
Comment Period End
NPRM
08/05/02
11/04/02
09/00/04
67 FR 50610


Regulatory Flexibility Analysis Required: Undetermined

Government Levels Affected: None

Agency Contact: Steven F. Witt, Director, Directorate of Standards and Guidance, Department of Labor, Occupational Safety and Health Administration, 200 Constitution Avenue, NW, Room N-3718, FP Building, Washington, DC 20210
Phone: 202 693-1950
Fax: 202 693-1678

RIN: 1218-AB89

Unified Agenda - Table of Contents Unified Agenda - Table of Contents