Standard Cited:19100036 B02 Design and construction requirements for exit routes.

Violation Items
Nr: 310988712 Citation: 01015 Issuance: 07/25/2008 ReportingID: 0418400
Viol Type:Serious NrInstances:7 Contest Date:07/25/2008
Abatement Date:08/04/2008 X Nr Exposed:40 Final Order:07/07/2010
Initial Penalty:7000.00 REC:A Emphasis:
Current Penalty:7000.00 Gravity:10 Haz Category:

Penalty and Failure to Abate Event History
Type Event Date Penalty abatement Type FTA Insp
Penalty Z: Issued 07/25/2008 7000.00 08/04/2008 Serious  
Penalty F: Formal Settlement 07/07/2010 7000.00 08/04/2008 Serious