Inspection Detail
Case Status: CLOSED |
Inspection: 1508444.015 - Celtic Cable Construction Llc
|
Inspection Information - Office: Oklahoma City | ||||
Nr: 1508444.015 | Report ID: 0627700 | Open Date: 01/04/2021 | ||
Celtic Cable Construction Llc | ||||
23461 W. 30th St. N. Haskell, OK 74436 | Union Status: NonUnion | |||
SIC: | ||||
NAICS: 238210/Electrical Contractors | ||||
Mailing: Po Box 366, Eufaula, OK 74432 | ||||
Inspection Type: | Fat/Cat | |||
Scope: | Partial | Advanced Notice: | N | |
Ownership: | Private | |||
Safety/Health: | Safety | Close Conference: | 01/04/2021 | |
Close Case: | 01/11/2022 | |||
Related Activity: | Type | ID | Safety | Health |
Inspection | 1529504 | Yes | ||
Accident | 1714516 | |||
Inspection | 1508445 | Yes |
Case Status: CLOSED |
Serious | Willful | Repeat | Other | Unclass | Total | |
---|---|---|---|---|---|---|
Initial Violations | 2 | 1 | 3 | |||
Current Violations | 2 | 1 | 3 | |||
Initial Penalty | $16,383 | $0 | $0 | $0 | $0 | $16,383 |
Current Penalty | $9,400 | $0 | $0 | $0 | $0 | $9,400 |
FTA Amount | $0 | $0 | $0 | $0 | $0 | $0 |
# | ID | Type | Standard | Issuance | Abate | Curr$ | Init$ | Fta$ | Contest | LastEvent | |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001A | Serious | 19100067 C02 V | 06/21/2021 | 07/15/2021 | $3,939 | $5,461 | $0 | I - Informal Settlement | ||
2. | 01001B | Serious | 19100030 A03 IV | 06/21/2021 | 08/16/2021 | $0 | $0 | $0 | I - Informal Settlement | ||
3. | 01002A | Serious | 19100268 B07 | 06/21/2021 | 07/15/2021 | $5,461 | $5,461 | $0 | I - Informal Settlement | ||
4. | 01002B | Serious | 19100268 C | 06/21/2021 | 12/01/2021 | $0 | $5,461 | $0 | I - Informal Settlement | ||
5. | 02001 | Other | 19040033 A | 06/21/2021 | 07/15/2021 | $0 | $0 | $0 | I - Informal Settlement |
Accident Investigation Summary | ||||||
---|---|---|---|---|---|---|
Summary Nr: 132096.015 | Event: 01/01/2021 | Employee Contacts Electrical Lines And Is Electrocuted | ||||
At 1:00 p.m. on January 1, 2021, Employee #1, employed by a cable construction c ompany, was preparing to install a fiber optic cable line at a residential site. He came into contact with live/energized electrical power lines and sustained severe electric shock. Employee #1 was killed by electrocution. | ||||||
Keywords: contact, electric current, electrocuted, energized, installing, optical fiber cable, power lines, residential construction | ||||||
Inspection | Degree | Nature | Occupation | |||
1 | 1508444.015 | Fatality | Telecomm: Line Installers And Repairers |