Inspection Detail
Case Status: OPEN |
Note: The following inspection has not been indicated as closed. Please be aware that the information shown may change, e.g. violations may be added or deleted. For open cases, in which a citation has been issued, the citation information may not be available for 5 days following receipt by the employer for Federal inspections or for 30 days following receipt by the employer for State inspections.
Inspection Information - Office: Or Health 1-Portland | ||||
---|---|---|---|---|
Nr: 1410797.015 | Report ID: 1054191 | Open Date: 06/21/2019 | ||
317724641 - Guzzman Pro Painting Llc | ||||
19612 Sw Deepwell Ct Aloha, OR 97078 | Union Status: NonUnion | |||
SIC: 1721/Painting and Paper Hanging | ||||
NAICS: 238320/Painting and Wall Covering Contractors | ||||
Mailing: 19612 Sw Deepwell Ct, Aloha, OR 97078 | ||||
Inspection Type: | Fat/Cat | |||
Scope: | Complete | Advanced Notice: | N | |
Ownership: | Private | |||
Safety/Health: | Health | Close Conference: | 09/10/2019 | |
Close Case: | ||||
Related Activity: | Type | ID | Safety | Health |
Accident | 1480653 |
Case Status: OPEN |
Violation Summary | ||||||
---|---|---|---|---|---|---|
Serious | Willful | Repeat | Other | Unclass | Total | |
Initial Violations | 2 | 2 | ||||
Current Violations | 2 | 2 | ||||
Initial Penalty | $1,125 | $0 | $0 | $0 | $0 | $1,125 |
Current Penalty | $1,125 | $0 | $0 | $0 | $0 | $1,125 |
FTA Amount | $0 | $0 | $0 | $0 | $0 | $0 |
Violation Items | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
# | ID | Type | Standard | Issuance | Abate | Curr$ | Init$ | Fta$ | Contest | LastEvent | |
1. | 01001A | Serious | OAR 437-002-0382(1)(C)-1 | 10/04/2019 | 06/21/2019 | $875 | $875 | $0 | Z - Issued | ||
2. | 01001B | Serious | OAR 437-002-0382(5)-6 | 10/04/2019 | 06/21/2019 | $0 | $0 | $0 | Z - Issued | ||
3. | 01001C | Serious | OAR 437-001-0760(1)(A)-1 | 10/04/2019 | 06/21/2019 | $0 | $0 | $0 | Z - Issued | ||
4. | 01002 | Serious | OAR 437-001-0704(3) | 10/04/2019 | 06/21/2019 | $250 | $250 | $0 | Z - Issued |
Accident Investigation Summary | ||||||
Summary Nr: 117577.015 | Event: 06/15/2019 | Employee Dies Of Cardiac Arrest, Possible Carbon Monoxide Po | ||||
At 6:00 p.m. on June 15, 2019, Employee #1, employed by a painting company, collapsed while working in an enclosed space, a garage with the door closed, and using a combustion engine pressure washer. Emergency response transported Employee #1 to the hospital, where he was pronounced dead from cardiac arrest with possible carbon monoxide poisoning. | ||||||
Keywords: paint, enclosed space, construction, chemical vapor, cardiac arrest, carbon monoxide, washing machine, unconsciousness, poisoning, painter | ||||||
Inspection | Degree | Nature | Occupation | |||
---|---|---|---|---|---|---|
1 | 1410797.015 | Fatality | Poisoning(Systemic) | Painting and paint spraying machine operators |