Accident Report Detail

Accident: 14567804 - Electric Shock - Ground Fault At Electric Meter

Accident: 14567804 -- Report ID: 0454520 -- Event Date: 07/12/1984
InspectionOpen DateSICEstablishment Name
1513339007/18/19849224Lake Cunningham Fire Dept
WHILE FIGHTING A TRAILER FIRE, TWO FIREMEN WERE RECEIVING ELECTRIC SHOCKS EVEN THOUGH THE ELECTRIC METER HAD BEEN PULLED AND THOUGH THE FIREMEN WERE WEARING FULL TURNOUT GEAR. THE ELECTRIC UTILITY WAS CALLED, AND THE ELECTRIC SERVICE WAS DISCONNECTED AT THE TRANSFORMER POLE. THE NEUTRAL AND PHASE CONDUCTORS HAD BEEN FUSED TOGETHER, WHICH CAUSED THE RELATIVE VOLTAGE ON THE NEUTRAL TO RISE. THIS IN TURN HAD ENERGIZED THE METER BASE.
Keywords: firefighter, service conductor, electrical, e gi vii, fire, electric meter, ground fault, electric shock
Employee # Inspection Age Sex Degree Nature Occupation
1 15133390 Hospitalized injury Electric Shock Firefighting occupations
2 15133390 Hospitalized injury Electric Shock Firefighting occupations

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.