Violation Detail
Standard Cited: 19100333 C03 III A Selection and use of work practices
Inspection Nr: 991319.015
Citation: 01002
Citation Type: Serious
Abatement Date: 10/27/2014 2
Initial Penalty: $7,000.00
Current Penalty: $0.00
Issuance Date: 10/21/2014
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): A
Gravity: 10
Report ID: 0627510
Contest Date:
Final Order: 11/10/2014
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/10/2014 | $0.00 | 10/27/2014 | Serious | |
| Penalty | Z: Issued | 10/21/2014 | $7,000.00 | 10/27/2014 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.333(c)(3)(iii)(A): Vehicles or mechanical equipment capable of having parts of their structures elevated near energized overhead lines were not operated so that a clearance of 10 feet (305 cm) was maintained. On or about August 20, 2014 the employer did not ensure that a pole truck was operated so that a minimum of ten feet was maintained from overhead power lines at the well site exposing employees to electrical hazards.