Violation Detail
Standard Cited: 19150181 B Electrical circuits and distribution boards.
Inspection Nr: 98680.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 02/22/2012 2
Initial Penalty: $7,000.00
Current Penalty: $0.00
Issuance Date: 02/14/2012
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0523100
Contest Date: 03/06/2012
Final Order: 02/19/2013
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 02/19/2013 | $0.00 | 02/22/2012 | Serious | |
| Penalty | F: Formal Settlement | 02/19/2013 | $7,000.00 | 02/22/2012 | Serious | |
| Penalty | C: Contested | 01/30/2013 | $7,000.00 | 02/22/2012 | Serious | |
| Penalty | Z: Issued | 02/14/2012 | $7,000.00 | 02/22/2012 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1915.181(b): Before an employee was permitted to work on an electrical circuit which was not required to be energized, the circuit was not de-energized and checked at the point at which the work was done to ensure that it was actually de-energized. (a) On the Jeffboat Transfer Cars - Employees were not checking the circuits to ensure that they were de-energized prior to performing work on the Jeffboat Transfer Cars. Employees believed that checking the circuit to ensure de-energization could be done by waiting 20 seconds.