Violation Detail
Standard Cited: 19100119 E05 Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 985164.015
Citation: 01006A
Citation Type: Serious
Abatement Date: 02/19/2015
Initial Penalty: $5,500.00
Current Penalty: $0.00
Issuance Date: 01/14/2015
Nr Instances: 2
Nr Exposed: 44
Related Event Code (REC):
Gravity: 5
Report ID: 0522500
Contest Date: 02/03/2015
Final Order: 10/28/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/28/2015 | $0.00 | 02/19/2015 | Serious | |
Penalty | C: Contested | 02/05/2015 | $5,500.00 | 02/19/2015 | Serious | |
Penalty | Z: Issued | 01/14/2015 | $5,500.00 | 02/19/2015 | Serious |
Text For Citation: 01 Item/Group: 006A Hazard:
29 CFR 1910.119(e)(5): The employer shall establish a system to promptly address the team's findings and recommendations; assure that the recommendations are resolved in a timely manner and that the resolution is documented; document what actions are to be taken; complete actions as soon as possible; develop a written schedule of when these actions are to be completed; communicate the actions to operating, maintenance and other employees whose work assignments are in the process and who may be affected by the recommendations or actions: a. The employer did not document the resolutions and develop a written schedule of when the 177 actions were to be completed for the 1999 revalidation PHA of No. 2 Formaldehyde Unit. b. The employer did not document the resolutions with completion dates and develop a written schedule with target dates as to when the 18 action items were to be completed for the 1996 initial PHA for Formaldehyde Plant #2.