Violation Detail
Standard Cited: 19260416 A03 General requirements.
Inspection Nr: 982804.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 11/20/2014 2
Initial Penalty: $7,000.00
Current Penalty: $4,000.00
Issuance Date: 11/07/2014
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0316400
Contest Date:
Final Order: 12/04/2014
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/04/2014 | $4,000.00 | 11/20/2014 | Serious | |
| Penalty | Z: Issued | 11/07/2014 | $7,000.00 | 11/20/2014 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1926.416(a)(3): Before work began, the employer did not ascertain by inquiry, direct observation, or by instruments, whether any part of an energized electric power circuit, exposed or concealed, was so located that the performance of the work could bring any person, tool, or machine into physical or electrical contact with the electric power circuit. (a) Mid-State Chevrolet Electrical Room: An employee was installing conductor wires from the subpanel to the subpanel breaker in the energized 3 phase 120/240 volt main distribution panel. The employer did not verify that main distribution panel was de-energized prior to beginning work, as determined on June 28, 2014. Abatement Documentation and Certification Required for this Item.