Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 982804.015
Citation: 01001
Citation Type: Serious
Abatement Date: 11/20/2014 2
Initial Penalty: $7,000.00
Current Penalty: $4,400.00
Issuance Date: 11/07/2014
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0316400
Contest Date:
Final Order: 12/04/2014
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/04/2014 | $4,400.00 | 11/20/2014 | Serious | |
| Penalty | Z: Issued | 11/07/2014 | $7,000.00 | 11/20/2014 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.416(a)(1): Employees in proximity to electric power circuits and were no protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means. (a) Mid-State Chevrolet Electrical Room: An employee was installing conductor wires from the subpanel to the subpanel breaker in the 3 phase 120/240 volt main distribution panel. The main distribution panel was energized with the cover removed exposing the employee to the energized circuits, as determined on June 28, 2014. Abatement Documentation and Certification Required for this Item.