Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 981524.015
Citation: 01002
Citation Type: Serious
Abatement Date: 06/30/2014 2
Initial Penalty: $3,080.00
Current Penalty: $1,540.00
Issuance Date: 06/24/2014
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0524200
Contest Date:
Final Order: 07/17/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/17/2014 | $1,540.00 | 06/30/2014 | Serious | |
Penalty | Z: Issued | 06/24/2014 | $3,080.00 | 06/30/2014 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a) Employees were exposed to the hazard of falling approximately 40 feet to the ground, while performing stucco work from tubular welded frame scaffold platform that was not fully planked. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.