Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 977332.015
Citation: 01005
Citation Type: Serious
Abatement Date: 12/12/2014 2
Initial Penalty: $5,500.00
Current Penalty: $5,500.00
Issuance Date: 11/17/2014
Nr Instances: 1
Nr Exposed: 9
Related Event Code (REC):
Gravity: 5
Report ID: 0213900
Contest Date: 12/09/2014
Final Order: 11/06/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 11/06/2015 | $5,500.00 | 12/12/2014 | Serious | |
Penalty | C: Contested | 12/10/2014 | $5,500.00 | 12/12/2014 | Serious | |
Penalty | Z: Issued | 11/17/2014 | $5,500.00 | 12/12/2014 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.119(j)(2): The employer did not establish written procedures to maintain the on-going integrity of process equipment: a) PC West Building: The employer did not establish written procedures to maintain the on-going integrity of HFA cylinders which have been are, or will be attached to the HFA intermediate receivers TEW-1 and TE-2, and are stored in the Marcotte Mall, on or about 5/19/14. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.