Violation Detail
Standard Cited: 19100303 G01 II General.
Inspection Nr: 975386.015
Citation: 02002
Citation Type: Other
Abatement Date: 3
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/29/2014
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity:
Report ID: 0316700
Contest Date:
Final Order: 11/13/2014
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/13/2014 | $0.00 | Other | ||
| Penalty | Z: Issued | 10/29/2014 | $0.00 | Other |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.303(g)(1)(ii): The required working space about electric equipment rated 600 volts, nominal, or less to ground, was used for storage: a) In the Workshop - On or about May 14, 2014, employees, working in the welding shop, were exposed to the electrical shock hazard of using the working space in front of the electrical breaker box for the storage finished work products. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.