Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 967468.015
Citation: 01003
Citation Type: Serious
Abatement Date: 07/22/2014 2
Initial Penalty: $2,800.00
Current Penalty: $2,800.00
Issuance Date: 06/02/2014
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0111400
Contest Date:
Final Order: 06/30/2014
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 06/02/2014 | $2,800.00 | 07/22/2014 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): Location: Jobsite Employees were exposed to fall hazards while working, where the scaffolds where not fully decked or planked between the front uprights and the guardrail supports.