Violation Detail
Standard Cited: 19100269 L02 Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 962461.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $2,800.00
Current Penalty: $2,800.00
Issuance Date: 07/09/2014
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0936300
Contest Date:
Final Order: 08/15/2014
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 07/09/2014 | $2,800.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.269(l)(2): The employer did not ensure that no employee(s) approached or took conductive objects closer to exposed energized parts than set forth in Tables R-6 through R-10: a. On January 18, 2014, at the Cabras 1 & 2 Power Plant, an employee climbed the transformer to work on electrical equipment within close proximity of energized parts, exposing himself to an electrical hazard.
Translate