Violation Detail
Standard Cited: 19100265 E01 V Sawmills.
Inspection Nr: 943170.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 05/09/2014 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/15/2014
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC): A
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 05/07/2014
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/07/2014 | $0.00 | 05/09/2014 | Serious | |
| Penalty | Z: Issued | 04/15/2014 | $0.00 | 05/09/2014 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.265(e)(1)(v): Barriers and warning signs were not provided to prevent employees from entering the space necessary for travel of log carriage: (a) Detweiler Lumber LLC, 46 Front Mountain, Road Allensville, PA - The employer did not not provide barriers or warning signs to prevent employees from entering the log carriage, on or about October 14, 2013. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Translate