Violation Detail
Standard Cited: 19100265 E01 IV Sawmills.
Inspection Nr: 943170.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $7,000.00
Current Penalty: $5,250.00
Issuance Date: 04/15/2014
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC): A
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 05/07/2014
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/07/2014 | $5,250.00 | Serious | ||
| Penalty | Z: Issued | 04/15/2014 | $7,000.00 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.265(e)(1)(iv): Positive means were not provided to prevent unintended movement of log carriage: (a) Detweiler Lumber, LLC, 46 Front Mountain Road, Allensville, PA - The employer did not provide a locking device on the hydraulic control to prevent unintended movement of the log carriage, thus exposing employees to serious injuries, on or about October 14, 2013. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Translate