Violation Detail
Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 939267.015
Citation: 01001
Citation Type: Serious
Abatement Date: 10/18/2013 5
Initial Penalty: $2,800.00
Current Penalty: $2,800.00
Issuance Date: 09/30/2013
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): C;I
Gravity: 10
Report ID: 0317000
Contest Date:
Final Order: 11/08/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 09/30/2013 | $2,800.00 | 10/18/2013 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(f)(6): The clearance between scaffolds and power lines were less than 3 feet. a) 840 - 842 Christian Street - Employees were removing stucco from a tubular welded frame scaffold approximately (1) foot from a service power line of approximately 220 - 240 volts, thus exposed to an electrocution hazard. Observed on or about September 05, 2013.