Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 936988.015
Citation: 01002
Citation Type: Serious
Abatement Date: 04/09/2014 2
Initial Penalty: $7,000.00
Current Penalty: $4,200.00
Issuance Date: 02/19/2014
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0636900
Contest Date: 03/19/2014
Final Order: 08/13/2014
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 08/13/2014 | $4,200.00 | 04/09/2014 | Serious | |
| Penalty | C: Contested | 03/20/2014 | $7,000.00 | 04/09/2014 | Serious | |
| Penalty | Z: Issued | 02/19/2014 | $7,000.00 | 04/09/2014 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.850(a): An engineering survey was not performed by a competent person to determine the conditions of the framing floors and walls and the possibility of unplanned collapse of any portion of the structure prior to permitting employees to start demolition operations. On or about August 24, 2013 the employer did not ensure that an engineering survey was performed to determine the condition of the structure prior to any demolition operations, exposing employees to struck by hazards.