Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 930829.015
Citation: 02004
Citation Type: Repeat
Abatement Date: 03/11/2014 2
Initial Penalty: $70,000.00
Current Penalty: $30,000.00
Issuance Date: 02/12/2014
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0419700
Contest Date: 03/05/2014
Final Order: 07/10/2015
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 07/10/2015 | $30,000.00 | 03/11/2014 | Repeat | |
| Penalty | C: Contested | 12/19/2014 | $70,000.00 | 03/11/2014 | Willful | |
| Penalty | Z: Issued | 02/12/2014 | $70,000.00 | 03/11/2014 | Willful |
Text For Citation: 02 Item/Group: 004 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a. On or about August 16, 2013, in the east wire bay, energy control procedures were not utilized for the MEP-2, exposing employees to being struck-by or caught-in the moving parts of the machine.
Translate