Violation Detail
Standard Cited: 19100425 C06 Surface-supplied air diving.
Inspection Nr: 926866.015
Citation: 01007
Citation Type: Serious
Abatement Date: 02/14/2014 2
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 02/04/2014
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0418800
Contest Date: 02/27/2014
Final Order: 10/21/2014
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | R: Review Commission | 10/21/2014 | $7,000.00 | 02/14/2014 | Serious | |
| Penalty | C: Contested | 03/03/2014 | $7,000.00 | 02/14/2014 | Serious | |
| Penalty | Z: Issued | 02/04/2014 | $7,000.00 | 02/14/2014 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.425(c)(6): A diver-carried reserve breathing gas supply was not provided when the diver was prevented by the configuration of the dive area from ascending directly to the surface during surface-supplied air diving, (is applicable to the construction standard by 29 CFR 1926.1085 that incorporates the General Industry requirement): a. On or about August 6th, 2013, at the above addressed job site, the employer did not provide an independent, backup surface supply air during hazardous underwater diving operations such as, but not limited to rock, toe stones, armor stones, and mattress beds with existing subsurface buoy lines, marine vessel traffic and entanglement hazards that could prevent free ascent to the surface.
Translate