Violation Detail
Standard Cited: 19100146 D01 Permit-required confined spaces
Inspection Nr: 925845.015
Citation: 01005B
Citation Type: Serious
Abatement Date: 12/25/2013 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/20/2013
Nr Instances: 2
Nr Exposed: 4
Related Event Code (REC): A
Gravity: 10
Report ID: 0522000
Contest Date: 12/18/2013
Final Order: 04/30/2014
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 04/30/2014 | $0.00 | 12/25/2013 | Serious | |
| Penalty | C: Contested | 12/18/2013 | $0.00 | 12/25/2013 | Serious | |
| Penalty | Z: Issued | 11/20/2013 | $0.00 | 12/25/2013 | Serious |
Text For Citation: 01 Item/Group: 005B Hazard:
29 CFR 1910.146(d)(1): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not implement the measures necessary to prevent unauthorized entry: (a) On or about August 6, 2013, at the Middletown plant (Plant 8) and all the other plants, the employer did not implement measures necessary to prevent unauthorized entries into the silos. (b) On or about June 11, 2013, at the Batavia plant (Plant #21), the employer did not implement measures to prevent unauthorized entries into the silos.