Violation Detail
Standard Cited: 19100147 D04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 922746.015
Citation: 02002D
Citation Type: Willful
Abatement Date: 02/10/2014 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/17/2014
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A;R
Gravity: 10
Report ID: 0521400
Contest Date: 02/07/2014
Final Order: 06/17/2019
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | W: Empr Withdrew | 06/17/2019 | $0.00 | 02/10/2014 | Willful | |
| Penalty | C: Contested | 02/07/2014 | $0.00 | 02/10/2014 | Willful | |
| Penalty | Z: Issued | 01/17/2014 | $0.00 | 02/10/2014 | Willful |
Text For Citation: 02 Item/Group: 002D Hazard:
29 CFR 1910.147(d)(4)(i):Lockout or tagout devices were not affixed to each energy isolating device by authorized employees: On or about July 20, 2013, at Dukane Precast Incorporated, maintence work was performed on the Batch Plant 3 mixer without a lockout device affixed to a pneumatic energy isolation device (line valve). Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Translate