Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 918395.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $4,900.00
Current Penalty: $4,900.00
Issuance Date: 11/26/2013
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0522300
Contest Date:
Final Order: 01/13/2014
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/13/2014 | $4,900.00 | Serious | ||
| Penalty | Z: Issued | 11/26/2013 | $4,900.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: On and before July 10, 2013, during the course of an irrigation system repair project near the #5 golf green, the 120 volt, 20 amp irrigation control power circuit was not de-energized and grounded or effectively guarded by other means.
Translate