Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 914354.015
Citation: 02004
Citation Type: Serious
Abatement Date: 12/23/2014 2
Initial Penalty: $7,000.00
Current Penalty: $4,000.00
Issuance Date: 12/19/2013
Nr Instances: 1
Nr Exposed: 20
Related Event Code (REC): C
Gravity: 10
Report ID: 0524700
Contest Date: 12/31/2013
Final Order: 11/24/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/24/2014 | $4,000.00 | 12/23/2014 | Serious | |
Penalty | C: Contested | 01/03/2014 | $7,000.00 | 01/15/2014 | Serious | |
Penalty | Z: Issued | 12/19/2013 | $7,000.00 | 01/15/2014 | Serious |
Text For Citation: 02 Item/Group: 004 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Reliable Castings Corporation - Sidney, Ohio: On or about October 8, 2013, a periodic inspection of the energy control procedures was not performed to assure that lockout/tagout procedures and requirements of 29 CFR 1910.147 were being followed. The employer did not assure that energy control procedures for Production Cells 1 and 3, located in ACO, were audited.