Violation Detail
Standard Cited: 19100269 M02 II Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 913624.015
Citation: 01005
Citation Type: Other
Abatement Date: 11/05/2013 2
Initial Penalty: $4,900.00
Current Penalty: $0.00
Issuance Date: 10/24/2013
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity:
Report ID: 0111100
Contest Date: 01/07/2014
Final Order: 05/26/2014
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 05/26/2014 | $0.00 | 11/05/2013 | Other | |
| Penalty | C: Contested | 01/22/2014 | $4,900.00 | 11/05/2013 | Serious | |
| Penalty | Z: Issued | 10/24/2013 | $4,900.00 | 11/05/2013 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.269(m)(2)(ii): If no system operator is in charge of the lines or equipment and their means of disconnection, one employee in the crew shall be designated as being in charge of the clearance. All of the requirements of paragraph (m)(3) of this section apply, in the order given, except as provided in paragraph (m)(2)(iii) of this section. The employee in charge of the clearance shall take the place of the system operator, as necessary. New Limerick Jobsite - During the response to a trouble call to the New Limerick jobsite, the employer did not designate an employee as being in charge of the clearance of an energized 14,400 volt primary line.