Violation Detail
Standard Cited: 19100303 B07 IV General.
Inspection Nr: 913340.015
Citation: 01004
Citation Type: Serious
Abatement Date: 10/03/2013 2
Initial Penalty: $7,000.00
Current Penalty: $3,500.00
Issuance Date: 09/23/2013
Nr Instances: 4
Nr Exposed: 5
Related Event Code (REC):
Gravity: 10
Report ID: 0418300
Contest Date:
Final Order: 10/22/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/22/2013 | $3,500.00 | 10/03/2013 | Serious | |
Penalty | Z: Issued | 09/23/2013 | $7,000.00 | 10/03/2013 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.303(b)(7)(iv): There were damaged parts that adversely affected safe operation or mechanical strength of the equipment, such as parts that were broken, bent, cut, or deteriorated by corrosion, chemical action, or overheating: (a) On or about 06/20/13 - Building 6, East wall, the 480-volt disconnect had a damaged box and control handle. (b) On or about 06/20/13 - Building 5, Ritter drill, the 480-volt disconnect had a damaged control handle. (c) On or about 06/20/13 - Building 5, Pistorius notcher, the 480-volt disconnect had a damaged control handle. (d) On or about 06/20/13 - Building 5, Extrema profiler, the 480-volt disconnect had a damaged control handle.