Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 912808.015
Citation: 01004
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $2,000.00
Current Penalty: $2,000.00
Issuance Date: 06/27/2013
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0216000
Contest Date:
Final Order: 08/13/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 06/27/2013 | $2,000.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows: On or about 6/17/2013, E. 230th Street a) Employees worked from a tubular welded frame scaffold that was not fully planked.