Violation Detail
Standard Cited: 19100253 B04 III Oxygen-fuel gas welding and cutting.
Inspection Nr: 912718.015
Citation: 01005
Citation Type: Serious
Abatement Date: 11/17/2013 4
Initial Penalty: $1,600.00
Current Penalty: $1,600.00
Issuance Date: 10/23/2013
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 5
Report ID: 0111500
Contest Date:
Final Order: 11/20/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 10/23/2013 | $1,600.00 | 11/17/2013 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.253(b)(4)(iii): Oxygen cylinders in storage were not separated from fuel-gas cylinders or combustible materials (especially oil or grease), a minimum distance of 20 feet (6.1 m) or by a noncombustible barrier at least 5 feet (1.5 m) high having a fire-resistance rating of at least one-half hour. Location: 25 Powers Drive, Meriden, CT 06451 The compressed oxygen cylinders were stored next to fuel gas (P-75) compressed gas cylinders along the west wall.