Violation Detail
Standard Cited: 19100305 G02 III Wiring methods, components, and equipment for general use.
Inspection Nr: 912601.015
Citation: 01016
Citation Type: Serious
Abatement Date: 08/10/2013 2
Initial Penalty: $2,000.00
Current Penalty: $0.00
Issuance Date: 07/23/2013
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 5
Report ID: 0522300
Contest Date:
Final Order: 08/20/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/20/2013 | $0.00 | 08/10/2013 | Serious | |
Penalty | Z: Issued | 07/23/2013 | $2,000.00 | 08/10/2013 | Serious |
Text For Citation: 01 Item/Group: 016 Hazard:
29 CFR 1910.305(g)(2)(iii): Flexible cords were not connected to devices and fittings so that tension would not be transmitted to joints or terminal screws: On or about June 19, 2013, the employer did not ensure flexible cords for the light on the main shredder and cords over the doorway to the employee break room were properly connected so that proper strain relief would prevent pull on the joints or terminal screws.