Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 912601.015
Citation: 01005A
Citation Type: Serious
Abatement Date: 09/30/2013 2
Initial Penalty: $2,800.00
Current Penalty: $2,800.00
Issuance Date: 07/23/2013
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0522300
Contest Date:
Final Order: 08/20/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/20/2013 | $2,800.00 | 09/30/2013 | Serious | |
Penalty | Z: Issued | 07/23/2013 | $2,800.00 | 08/10/2013 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: On or about June 19, 2013, the employer did not conduct periodic inspections of the energy control procedure at least annually to ensure employees where following the company energy control procedures.