Violation Detail
Standard Cited: 19100119 D03 II Process safety management of highly hazardous chemicals.
Inspection Nr: 909370.015
Citation: 01002
Citation Type: Serious
Abatement Date: 12/31/2014 2
Initial Penalty: $3,850.00
Current Penalty: $3,850.00
Issuance Date: 11/27/2013
Nr Instances: 2
Nr Exposed: 70
Related Event Code (REC):
Gravity: 5
Report ID: 0112000
Contest Date: 12/18/2013
Final Order: 12/17/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 12/17/2014 | $3,850.00 | 12/31/2014 | Serious | |
Penalty | C: Contested | 12/18/2013 | $3,850.00 | 03/03/2014 | Serious | |
Penalty | Z: Issued | 11/27/2013 | $3,850.00 | 03/03/2014 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.119(d)(3)(ii): The employer did not document that equipment complies with recognized and generally accepted good engineering practices: A. On or about May 31, 2013, Facility: The employer did not comply with a RAGAGEP, such as, but not limited to ASME Boiler and Pressure Vessel Code, Section VIII or API 520, in that: 1. The employer did not document the inlet pressure drop for pressure relief valves used to protect the pressure vessel containing isopentane. 2. The employer did not document the built up back pressure of the pressure relief valves used to protect the pressure vessel containing isopentane.