Violation Detail
Standard Cited: 19100268 J04 I Telecommunications.
Inspection Nr: 908374.015
Citation: 01002
Citation Type: Serious
Abatement Date: 11/13/2013 2
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 11/06/2013
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0418300
Contest Date:
Final Order: 11/22/2013
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/22/2013 | $7,000.00 | 11/13/2013 | Serious | |
| Penalty | Z: Issued | 11/06/2013 | $7,000.00 | 11/13/2013 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.268(j)(4)(i): Derrick trucks or similar equipment were operated with conductive parts of the equipment closer to exposed energized power lines than the clearances set forth in Table R-2 of this section: (a) On or about 5/22/13 - at 5th Alley between 5th and 6th Avenue South and 37th and 38th Street South, Birmingham, AL 35222, an employee operating an Altec Digger Derrick (model DC47TR) to stow the boom contacted an energized 7.6-kV power line.
Translate