Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 904145.015
Citation: 01007A
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $1,600.00
Current Penalty: $1,120.00
Issuance Date: 10/24/2013
Nr Instances: 1
Nr Exposed: 8
Related Event Code (REC):
Gravity: 5
Report ID: 0636900
Contest Date:
Final Order: 11/15/2013
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/15/2013 | $1,120.00 | Serious | ||
| Penalty | Z: Issued | 10/24/2013 | $1,600.00 | Serious |
Text For Citation: 01 Item/Group: 007A Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and/or cables were run through holes in walls, ceilings, or floors: On or about May 2, 2013, an extension cord used to energize a fan in the restroom was ran through the maintenance shop wall, exposing employees to electrical shock hazards.
Translate