Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 898359.015
Citation: 01006
Citation Type: Serious
Abatement Date: 06/13/2013 2
Initial Penalty: $4,900.00
Current Penalty: $3,200.00
Issuance Date: 05/24/2013
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0213100
Contest Date: 06/18/2013
Final Order: 12/09/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 12/09/2013 | $3,200.00 | 06/13/2013 | Serious | |
Penalty | C: Contested | 06/18/2013 | $4,900.00 | 06/13/2013 | Serious | |
Penalty | Z: Issued | 05/24/2013 | $4,900.00 | 06/13/2013 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1926.850(a): An engineering survey was not performed by a competent person to determine the conditions of the framing floors and walls and the possibility of unplanned collapse of any portion of the structure prior to permitting employees to start demolition operations. a) Student Center Interior Courtyard, Marist College, on or about 3/27/2013; The employer did not provide a written engeneering survey for demolition of this section of the building.