Violation Detail
Standard Cited: 19100424 C05 SCUBA diving.
Inspection Nr: 858843.015
Citation: 01006
Citation Type: Serious
Abatement Date: 08/05/2013 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/30/2013
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): A
Gravity: 10
Report ID: 0316100
Contest Date:
Final Order: 08/21/2013
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 07/30/2013 | $0.00 | 08/05/2013 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.424(c)(5): The valve of the reserve breathing gas supply was not in the closed position prior to conducting SCUBA diving operations: a) UTF Super Pond - Employees were engaged in an underwater rigging operation 127 feet below the surface and each divers reserve breathing supply valve was in the open position, on or about 01/30/13. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Translate