Violation Detail
Standard Cited: 19260451 E01 General requirements.
Inspection Nr: 853483.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $2,000.00
Current Penalty: $2,000.00
Issuance Date: 04/30/2013
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC): I
Gravity: 5
Report ID: 0213400
Contest Date:
Final Order: 08/08/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 04/30/2013 | $2,000.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, stucture, personnel hoist, or similar surface was not used. Cross-braces were used as a means of access: a) 25 Blackhorse Court, Staten Island, NY -Employees were exposed to fall hazards of approximately 13' 1" to the ground below when a ladder was not provided for safe access to a scaffold platform. Condition observed on or about January 29, 2013.