Violation Detail
Standard Cited: 19260651 K01 Specific Excavation Requirements.
Inspection Nr: 831581.015
Citation: 01002
Citation Type: Serious
Abatement Date: 10/09/2013 2
Initial Penalty: $7,000.00
Current Penalty: $3,500.00
Issuance Date: 06/20/2013
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0728900
Contest Date: 07/03/2013
Final Order: 10/25/2013
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 10/25/2013 | $3,500.00 | 10/09/2013 | Serious | |
| Penalty | C: Contested | 08/22/2013 | $7,000.00 | 07/17/2013 | Serious | |
| Penalty | Z: Issued | 06/20/2013 | $7,000.00 | 07/17/2013 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.651(k)(1): An Inspection of the excavation, adjacent areas, and protective systems by a competent person was not accomplished prior to the start of work and as needed throughout the shift: On the North West corner of the building located at 1030 Southern Hills Dr. Hastings, NE, 68901 - Employer failed to conduct an inspection prior to starting work when employees were to enter the trench. This inspection includes but is not limited to clarifying the soil to determine the appropriate protective system for the excavation; design a ramp or provide a ladder for access and egress; determine cave-in potential to decide whether shoring or other protective systems are needed.
Translate