Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 790121.015
Citation: 01003
Citation Type: Serious
Abatement Date: 06/26/2013 2
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 05/31/2013
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0215800
Contest Date:
Final Order: 06/25/2013
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/25/2013 | $7,000.00 | 06/26/2013 | Serious | |
| Penalty | Z: Issued | 05/31/2013 | $7,000.00 | 06/26/2013 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the techniques to be utilized for the control of hazardous energy, including, but not limited to Items of this section: a) On or about 12/14/2012, In the foundry: Specific energy control procedures for the Inliner machine did not address Potential Energy from the raised "spider" and cylinder such as, but not limited to the installation of a support. Abatement documentation is required for this item.