Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 784801.015
Citation: 01002
Citation Type: Serious
Abatement Date: 04/22/2013 2
Initial Penalty: $2,800.00
Current Penalty: $2,240.00
Issuance Date: 04/16/2013
Nr Instances: 3
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0215000
Contest Date: 05/13/2013
Final Order: 09/20/2013
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 09/20/2013 | $2,240.00 | 04/22/2013 | Serious | |
| Penalty | C: Contested | 05/13/2013 | $2,800.00 | 04/22/2013 | Serious | |
| Penalty | Z: Issued | 04/16/2013 | $2,800.00 | 04/22/2013 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.36(d)(1): Exit doors were locked. The employer did not ensure that employees will be able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a) Fire exit doors A B and D in the basement were locked with an electronic key-card device that locks when the door closes. Employees were exposed to delay in escape in a fire/smoke or other emergency. Location: 90 Laight Street, NY , N.Y. On or about 10-29-2012 NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM IN ACCORDANCE WITH 29 CFR 1903.19.
Translate