Violation Detail
Standard Cited: 19100119 M03 Process safety management of highly hazardous chemicals.
Inspection Nr: 783282.015
Citation: 01019
Citation Type: Serious
Abatement Date: 03/01/2015 2
Initial Penalty: $5,500.00
Current Penalty: $4,125.00
Issuance Date: 06/06/2013
Nr Instances: 4
Nr Exposed: 21
Related Event Code (REC):
Gravity: 5
Report ID: 0522500
Contest Date: 06/27/2013
Final Order: 01/13/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 03/11/2014 | $1,375.00 | 07/11/2013 | Serious | |
Penalty | F: Formal Settlement | 01/13/2014 | $4,125.00 | 03/01/2015 | Serious | |
Penalty | Z: Issued | 06/06/2013 | $5,500.00 | 07/11/2013 | Serious |
Text For Citation: 01 Item/Group: 019 Hazard:
29 CFR 1910.119(m)(3): An incident investigation team shall be established and consist of at least one person knowledgeable in the process involved, including a contract employee if the incident involved work of the contractor, and other persons with appropriate knowledge and experience to thoroughly investigate and analyze the incident: a. For the incident which occurred in S.P.A. Production Building #1 on or about January 31, 2011, and involved cord breaking at the take-up spool on overspin machine number 23 in the overspin operation, an incident investigation team was not established. b. For the incident which occurred in S.P.A. Production Building #1 on or about January 6, 2011, at 1:30 PM, and involved detonating cord being pulled back due to being off center and rubbing the side of the extruder in the extrusion operation, an incident investigation team was not established. c. For the incident which occurred in S.P.A. Production Building #1 on or about January 6, 2011, at 9:00 AM, and involved loose yarns/threads on cord to jam on waxer dies causing detonating cord to break in the overspin operation, an incident investigation team was not established. d. For the incident which occurred in the FAR Production Building on or about July 28, 2009, and involved the detonation of oversized detonating cord in the sizing operation, the employers incident investigation report did not identify the members of the investigation team.