Violation Detail
Standard Cited: 19100119 E03 VI Process safety management of highly hazardous chemicals.
Inspection Nr: 783282.015
Citation: 01007
Citation Type: Serious
Abatement Date: 03/01/2015 2
Initial Penalty: $5,500.00
Current Penalty: $4,125.00
Issuance Date: 06/06/2013
Nr Instances: 3
Nr Exposed: 94
Related Event Code (REC):
Gravity: 5
Report ID: 0522500
Contest Date: 06/27/2013
Final Order: 01/13/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 03/11/2014 | $1,375.00 | 07/11/2013 | Serious | |
Penalty | F: Formal Settlement | 01/13/2014 | $4,125.00 | 03/01/2015 | Serious | |
Penalty | Z: Issued | 06/06/2013 | $5,500.00 | 07/11/2013 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.119(e)(3)(vi): The process hazard analysis shall address: Human factors: a. The employer's 2004 PHA-Cast Booster Manufacturing did not adequately address human factors including, but not limited to, the following: housekeeping and general work environment, accessibility and availability of controls and equipment, component labeling, feedback and displays, controls, workload and stress factors, procedures, training, and general issues. b. The employer's 2004 PHA-Detonating Cord Manufacturing did not address human factors including, but not limited to, the following: housekeeping and general work environment, accessibility and availability of controls and equipment, component labeling, feedback and displays, controls, workload and stress factors, procedures, training, and general issues. c. The employer's 2004 PHA-Emulsion Manufacturing did not adequately address human factors including, but not limited to, the following: housekeeping and general work environment, accessibility and availability of controls and equipment, component labeling, feedback and displays, controls, workload and stress factors, procedures, training, and general issues.