Violation Detail
Standard Cited: 19100119 E03 I Process safety management of highly hazardous chemicals.
Inspection Nr: 783282.015
Citation: 01003
Citation Type: Serious
Abatement Date: 03/01/2015 2
Initial Penalty: $5,500.00
Current Penalty: $4,125.00
Issuance Date: 06/06/2013
Nr Instances: 5
Nr Exposed: 72
Related Event Code (REC):
Gravity: 5
Report ID: 0522500
Contest Date: 06/27/2013
Final Order: 01/13/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 03/11/2014 | $1,375.00 | 07/11/2013 | Serious | |
Penalty | F: Formal Settlement | 01/13/2014 | $4,125.00 | 03/01/2015 | Serious | |
Penalty | Z: Issued | 06/06/2013 | $5,500.00 | 07/11/2013 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.119(e)(3)(i): The process hazard analysis shall address: The hazards of the process: a. The employer's 2004 PHA-Cast Booster Manufacturing did not include an analysis of utility systems such as electric and its effect on the process. b. The employer's 2004 PHA-Cast Booster Manufacturing did not address preventative or corrective measures for a "PETN spill" under #6 of "Balloon Filling" operations. c. The employer's 2004 PHA-Detonating Cord Manufacturing did not include an analysis of utility systems such as electric and water and their effects on the process. d. The employer's 2004 PHA-Detonating Cord Manufacturing did not address preventative or corrective measures for "Fugitive PETN Impact/Friction Explosion" under #11 of "Extruder Operation" and #6 of "Cord Sizer" operations. e. The employer's 2004 PHA-Detonating Cord Manufacturing inaccurately identified various operations as "PETN Dryer Operation" on pages 8 through 49.