Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 77302.015
Citation: 01004
Citation Type: Serious
Abatement Date: 12/28/2011 2
Initial Penalty: $4,200.00
Current Penalty: $4,200.00
Issuance Date: 12/06/2011
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0521400
Contest Date:
Final Order: 01/03/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/03/2012 | $4,200.00 | 12/28/2011 | Serious | |
| Penalty | Z: Issued | 12/06/2011 | $4,200.00 | 12/28/2011 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: Employees were permitted to work around overhead energized 7000 volt power lines while operating an aerial lift during commercial painting operations and thus were not protected against electrical shock either by de-energizing and grounding the circuits, or guarding the power lines by insulation. Certification is not required for this item, the project is complete.