Violation Detail
Standard Cited: 19260553 A04 Base-mounted drum hoists.
Inspection Nr: 694118.015
Citation: 01006
Citation Type: Serious
Abatement Date: 04/25/2013 2
Initial Penalty: $4,900.00
Current Penalty: $2,450.00
Issuance Date: 04/12/2013
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 05/02/2013
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/02/2013 | $2,450.00 | 04/25/2013 | Serious | |
| Penalty | Z: Issued | 04/12/2013 | $4,900.00 | 04/25/2013 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1926.553(a)(4): All base-mounted drum hoists in use did not meet the applicable requirements for design, construction, installation, testing, inspection, maintenance, and operations, as prescribed by the manufacturer: a) The employer does not ensure that base-mounted drum hoists meet the applicable requirements for design, construction, installation, testing, inspection, maintenance, and operations, as prescribed by the manufacturer. This violation occurred on or about October 16, 2012, when employees were using a base mounted drum hoist (My-Te AC-36 Base Mounted Drum Hoist; SN: E5680B67) with a wire rope size (Lift-All IWRC one-quarter (¼) inch wire rope, 6x19) that was smaller than that prescribed as acceptable by the manufacturer (three-eighths (3/8) inch minimum diameter).
Translate