Violation Detail
Standard Cited: 19260405 G02 III Wiring methods, components, and equipment for general use.
Inspection Nr: 694118.015
Citation: 01005A
Citation Type: Other
Abatement Date: 04/25/2013 2
Initial Penalty: $700.00
Current Penalty: $0.00
Issuance Date: 04/12/2013
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0625700
Contest Date:
Final Order: 05/02/2013
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/02/2013 | $0.00 | 04/25/2013 | Other | |
| Penalty | Z: Issued | 04/12/2013 | $700.00 | 04/25/2013 | Other |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1926.405(g)(2)(iii): Flexible cords were not used in continuous lengths without splice or tap: The employer does not ensure that flexible cords are not used in continuous lengths without splice or tap. This violation occurred on or about October 16, 2012, when the employer allowed employees to use a base mounted drum hoist (My-Te AC-36; SN: E5680B67) with the flexible cord for the control switch cut and spliced in two places to insert an SO cord extending its length.
Translate