Violation Detail
Standard Cited: 19100147 C06 I A The control of hazardous energy (lockout/tagout).
Inspection Nr: 592058.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 10/15/2013 2
Initial Penalty: $5,000.00
Current Penalty: $5,000.00
Issuance Date: 02/21/2013
Nr Instances: 1
Nr Exposed: 35
Related Event Code (REC):
Gravity: 5
Report ID: 0524500
Contest Date:
Final Order: 03/14/2013
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/14/2013 | $5,000.00 | 10/15/2013 | Serious | |
| Penalty | Z: Issued | 02/21/2013 | $5,000.00 | 04/09/2013 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.147(c)(6)(i)(A): The periodic inspection of the energy control procedure was not performed by an authorized employee other than the one utilizing the energy control procedure being inspected: In Building AA, the periodic inspection was conducted by the same employee that performed the servicing and/or maintenance.