Violation Detail
Standard Cited: 19100217 F02 Mechanical power presses.
Inspection Nr: 561298.015
Citation: 01006B
Citation Type: Serious
Abatement Date: 11/01/2012 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/02/2012
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): C
Gravity: 10
Report ID: 0522000
Contest Date: 10/26/2012
Final Order: 03/15/2013
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/15/2013 | $0.00 | 11/01/2012 | Serious | |
| Penalty | C: Contested | 10/29/2012 | $0.00 | 11/01/2012 | Serious | |
| Penalty | Z: Issued | 10/02/2012 | $0.00 | 11/01/2012 | Serious |
Text For Citation: 01 Item/Group: 006B Hazard:
29 CFR 1910.217(f)(2): Supervision to ensure that correct operating procedures were being followed on mechanical power press(es) was inadequate: (a) On or about May 8, 2012, there was inadequate supervision for the employee operating Press #27 and changing dies in the press in that when the foreman came to help, did not ensure that the press motor was off, the flywheel was stopped and the press was locked out by all employees exposed to accidental activation or movement.
Translate